It went by quickly but when I look behind me I don’t see that I accomplished a hell of a lot. Mind you, I lost three days out of the middle going to a time waster conference in Calgary so that only leaves 4 days and I’ve been sick the last 2 of those.
Several years ago now the Canadian Consulting Agrologists Association (CCAA) put on a few really good PD seminars in Banff and then in Calgary. Then the CCAA merged with some high falutin’ management consulting outfit from eastern Canada and they haven’t put on a decent conference since. The one last week was really bad – there was hardly anyone there and the content sucked. The only real reason left to attend the thing is for networking opportunities and if there’s no one there then there isn’t much opportunity to network. So I won’t be going to the one next fall, assuming they actually try to hold one again.
SWMBO is alternating between answering the phone and collecting water bills for the village and making sanding dust in the house. We’re nearly ready to paint the ceilings but we may postpone that until spring so that we can have the windows open. We’re going to use oil based paint for the ceilings – it will likely stink pretty bad if the house is closed up when we do it.
I’d been postponing changing the plugs and coils in the Lincoln because I had heard so much bad about the job. Apparently the plugs often strip out the heads and when they don’t do that they actually break off in the head. They’re in the bottom of a really deep recess so I can imagine how they could be a problem. They also have super long threads on the plugs which could help them get stuck in the heads. I had all the parts before the Calgary fiasco but decided to put the project off until I got home just in case it went south on me. As it turned out it wasn’t really a problem at all. I blew the recesses out with compressed air and then pissed a bunch of my favorite weasel piss (3-in-one) in all the holes. After that had sat for a couple of hours each plug came out easily. It took a lot of torque to break most of them free but once they were free they spun out by hand. Then I put a copious amount of never seize on the threads on the new plugs and carefully started them back in. The whole project probably took 3 hours but that was only because I was being super careful and it included changing the headlamps as well.
No comments:
Post a Comment